Works at McPhillips’ residential infrastructure site at Reaseheath near Nantwich, Cheshire saw a 23 tonne steel pedestrian footbridge craned into position onto reinforced concrete abutments at the end of July. The 29m long, 3m wide off-site manufactured bridge has been installed to provide a new crossing of the River Weaver.
Back